Bawabat Al- Rumaila Group is committed to provide quality control plans and ensure the effluence of
the procedures through its structure. Q.C plan is interacted with every item of work and generally
consisting of three different and sequenced phases:
• Preparatory phase.
• Follow up phases.
• Completion.
Documentation is entered into the organization structure to ensure that tracking of records for
every quality issue is maintained until final solution achieved, this includes:
• Deficiency report.
• Corrective action reports.
• Punch list.
• Pre-final inspection report.
• Final inspection and hand over.
A well qualified Quality Control manager and his followers are appointed for each project and
they are authorized to act their job and have the full power to correct any activity.

This department has some of NDT Equipments likes:

 