|
|
|
|
|
|
|
|
|
No |
Project Name |
Clint |
Project Amount USD |
Period |
|
|
1 |
EPC of Mechanical Structural and Piping Works at Hammar Degassing Station |
HLG |
|
|
|
|
|
|
2 |
EPC of Pipeline Works at Umm Qasr Terminal-3 |
HLG |
|
|
|
|
|
|
3 |
EPC of Pump Installation and Instrumentation Work at Hammar Degassing Station |
HLG |
|
|
|
|
|
|
4 |
EPC of 5000 CBM Tank Construction and Piping Works at West Quarna -2 Oil Development Project |
INCO |
|
|
|
|
|
|
5 |
S-41 /2013 Pipe line from CLUSTER 5,6,7 to CPF size 20’’ & 24’ |
Lukoil |
$ 6,500,800.00 |
2013-2014 |
|
|
6 |
31-BASRAH-2014 Pipe line from VALVE MANIFOLD to ZUBAIR STATION1 size 14’’ |
SOC |
$ 1,580,000.00 |
2014-2015 |
|
|
7 |
89-BASRAH-2014 Pipe line from VALVE MANIFOLD IN RUMAILLA ROAD to AL TOUBA STATION size 12’’ |
SOC |
$ 2,850,500.00 |
2014-2015 |
|
|
8 |
P.O NO. 10578104- |
Weatherford |
$ 3,600,500.00 |
2012-2014 |
|
|
2012 |
|
|
Pipe line from RIVER BASRAH to WATER TREATMENT LIFT STATION IN W.Q1 size 16’’ |
|
|
9 |
Flow line 8’’,10’’&12’’ from MANIFOLDS 8/2, 8/4, 8/5 & 7/12 in W.Q1 |
Al Jazeel Co. |
$ 1,856,025.00 |
2014-15 |
|
|
10 |
EXECUTED Road crossing by Boring Machine Method different sizes from 4’’ to up 36’’ in W.Q2 |
Lukoil |
$ 753,050.00 |
2014-15 |
|
|
11 |
EXECUTED Road crossing by Boring Machine Method different sizes from 12’’ to up 24’’ |
AHAK Co. |
$ 502,000.00 |
2015 |
|
|
|
|
|
|
|
|
|
|
|