x
B A W A B A T A L R U M A I L A

Mechanical Projects

Bawabat Al Rumaila Group

>Mechanical Projects

No Project Name Clint Project Amount USD Period
1 EPC of Mechanical Structural and Piping Works at Hammar Degassing Station HLG
2 EPC of Pipeline Works at Umm Qasr Terminal-3 HLG
3 EPC of Pump Installation and Instrumentation Work at Hammar Degassing Station HLG
4 EPC of 5000 CBM Tank Construction and Piping Works at West Quarna -2 Oil Development Project INCO
5 S-41 /2013 Pipe line from CLUSTER 5,6,7 to CPF size 20’’ & 24’ Lukoil $ 6,500,800.00 2013-2014
6 31-BASRAH-2014 Pipe line from VALVE MANIFOLD to ZUBAIR STATION1 size 14’’ SOC $ 1,580,000.00 2014-2015
7 89-BASRAH-2014 Pipe line from VALVE MANIFOLD IN RUMAILLA ROAD to AL TOUBA STATION size 12’’ SOC $ 2,850,500.00 2014-2015
8 P.O NO. 10578104- Weatherford $ 3,600,500.00 2012-2014
2012
Pipe line from RIVER BASRAH to WATER TREATMENT LIFT STATION IN W.Q1 size 16’’
9 Flow line 8’’,10’’&12’’ from MANIFOLDS 8/2, 8/4, 8/5 & 7/12 in W.Q1 Al Jazeel Co. $ 1,856,025.00 2014-15
10 EXECUTED Road crossing by Boring Machine Method different sizes from 4’’ to up 36’’ in W.Q2 Lukoil $ 753,050.00 2014-15
11 EXECUTED Road crossing by Boring Machine Method different sizes from 12’’ to up 24’’ AHAK Co. $ 502,000.00 2015
Choose Layout
RTL Version
Boxed Version
Want Sticky Header